Text

1972 Olympic architecture meets modern engineering

published in sb 6/2020

The venue of the 20th Summer Olympics has undergone extensive refurbishment. With the participation of the originator architects, the architects of planplus have brought the architecture and design of 1972 back to life. The entire technical infrastructure has been upgraded along with the pool water treatment and fire protection systems. The swimming pools with their new moving floor technology have been designed in stainless steel and are now suitable for national competitions. The completely new children’s paddling area extends the facility’s range of attractions.

Preview image
Bild
Pool Olympiapark Munich_sb 6 2020_way square_oliver jung

photo: Oliver Jung